Ward 4 Sidewalks

This includes site preparation, concrete work, storm drainage, traffic maintenance, and compliance with Federal ADA regulations, to be completed within 90 days.
Bid Documents (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
4-Scope of Work ITB WARD 4 SIDEWALKS 597.0 KB
5-Contract Document WARD 4 SIDEWALKS 1.4 MB