Ward 4 Sidewalks

This includes site preparation, concrete work, storm drainage, traffic maintenance, and compliance with Federal ADA regulations, to be completed within 90 days.

Status

Bidding Closed

Bid Date 3/18/25 2:00pm

Company & Contacts

Wagner General Contractors, Inc.
Rochelle Waddill  
901-386-0060

Location

City of Little Rock, Arkansas

The scope of work includes:

  • Site preparation, including removal and disposal of existing sidewalks

  • Construction of underground storm drainage, curb inlet construction, sidewalk, curb, and driveway reconstruction

  • Installation of concrete driveways, aprons, curbs, gutters, and access ramps

  • Maintenance of traffic during construction

  • Final clean-up of the work areas

The project requires compliance with Federal ADA regulations and standards and is expected to be completed within 90 days of receiving the Notice to Proceed. The successful contractor must carry appropriate insurance and provide required bonds. The project also includes performance metrics to evaluate the contractor's responsiveness, work quality, schedule adherence, and cost control.