Ward 4 Sidewalks

This includes site preparation, concrete work, storm drainage, traffic maintenance, and compliance with Federal ADA regulations, to be completed within 90 days.
Bid Documents (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
001 C1 557.6 KB
002 C2 371.2 KB
003 C3 349.5 KB
004 C4 621.6 KB
005 C5 194.3 KB
006 C6 367.2 KB
007 C7 750.9 KB
008 C8 718.5 KB
009 C9 221.5 KB
010 C10 766.6 KB
011 C11 818.4 KB
012 C12 178.4 KB
013 C13 167.3 KB
014 C14 1.7 MB
015 SI-3 1.6 MB
016 C14 452.8 KB
017 C15 2.9 MB
018 C16 2.5 MB
019 C17 4.0 MB