NWCC South Warehouse
Construction of a new warehouse. Main structural system is a pre-engineered metal building with metal wall panels and standing seam metal roof. 2. All mechanical and electrical work as indicated. 3. New concrete sidewalks, ramps, handrails, asphalt and concrete paving, and other site improvements. 4. All temporary fences, and general protection system for the students, faculty, and public for this portion of the Work. 5. Protection of existing sidewalks, fencing, landscaping, etc. to remain.
Bid Documents
(click to expand/collapse)

Hard copies of plans and specifications are available for purchase at contractor’s expense, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Name | Size | |||
001 COVER | 2.3 MB | |||
002 G001 | 1.2 MB | |||
003 LS100 | 263.6 KB | |||
004 C000 | 2.3 MB | |||
005 C001 | 732.3 KB | |||
006 C100 | 591.1 KB | |||
007 C200 | 623.1 KB | |||
008 C300-A | 633.4 KB | |||
009 C300-B | 635.5 KB | |||
010 C300-C | 634.4 KB | |||
011 C301 | 582.5 KB | |||
012 C400 | 781.3 KB | |||
013 C500 | 866.0 KB | |||
014 S100 | 482.4 KB | |||
015 S200 | 486.2 KB | |||
016 S201 | 488.6 KB | |||
017 S202 | 497.0 KB | |||
018 S300 | 494.7 KB | |||
019 A001 | 356.4 KB | |||
020 A100 | 306.8 KB | |||
021 A101 | 315.8 KB | |||
022 A130 | 363.4 KB | |||
023 A200 | 371.1 KB | |||
024 A300 | 392.9 KB | |||
025 A340 | 302.0 KB | |||
026 A600 | 267.4 KB | |||
027 FP000 | 385.3 KB | |||
028 FP101 | 400.1 KB | |||
029 FP201 | 457.4 KB | |||
030 M001 | 257.1 KB | |||
031 M101 | 350.4 KB | |||
032 M102 | 355.4 KB | |||
033 M103 | 382.6 KB | |||
034 M001 | 262.2 KB | |||
035 P001 | 385.2 KB | |||
036 P101 | 394.6 KB | |||
037 P102 | 388.0 KB | |||
038 P103 | 389.7 KB | |||
039 P301 | 420.2 KB | |||
040 F001 | 398.9 KB | |||
041 E100 | 2.1 MB | |||
042 E200 | 440.1 KB | |||
043 E201 | 455.2 KB | |||
044 E202 | 465.0 KB |