CAW Westrock Landing Parking Improvements
The project includes but is not limited to the construction of a new 9,650sf, single-story main building organized into two components: a pre-engineered metal building for laboratory, workshop and storage functions, and a hybrid glulam and steel frame structure for administrative offices, classroom and conference space. A separate, 1,100sf pre-engineered metal storage building is also included on the site (re: deductive alternate #1). Site development includes a car and boat trailer parking area, visitor and staff parking, concrete and gravel walks and site lighting. Civil work includes grading, new utilities and stormwater infrastructure such as bioswales and rain gardens. Landscaping consists of native trees, shrubs, grasses and perennials in contained areas.
Bid Documents
(click to expand/collapse)

Hard copies of plans and specifications are available for purchase at contractor’s expense, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Name | Size | |||
Specifications | 16.8 MB |