New Library for Mt Vernon
The work consists of a pre-engineered structural steel frame with masonry veneer, over metal studs, EIFS, aluminum storefront and glazing system with a sloped prefinished standing seam roof system. Also included in the scope of work mechanical, electrical, plumbing systems, interior and exterior solid wood soffits, cold rolled metal drywall framing, suspended acoustic ceilings, wood millwork and interior finishes.
Status
Accepting Bids
Bid Date | 9/30/25 2:00pm |
Company & Contacts
Wagner General Contractors, Inc.
Michea Copus
(501) 203-0704
Location
Mt. Vernon, AR
Bid Information:
Separate sealed bids for NEW LIBRARY FOR MT. VERNON, AR – FAULKNER CO LIBRARY SYSTEM project will be received until 2:00 PM CST, SEPTEMBER 30, 2025 at the Architect’s Office: H+N Architects, 1109 Main Street, Conway, Arkansas 72032. Tel: 501.327.7525 and publicly opened. Bids received after this time will not be accepted.
Hard copies of plans and specifications are available for purchase at contractor’s expense, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.