UAMS Gastro Endoscopy Suite at Freeway Medical Tower

The Project consists of the remodel of the 7th floor of Freeway Medical Tower. This remodel will turn the entire floor into an Endoscopy Suite. The Suite will include Pre-op/Recovery bays, (4) Endoscopy Rooms, (16) Pre-op/Recovery bays, (3) infusion chairs, and (1) Motility Lab.

Status

Accepting Bids

Prebid Date 9/2/25 9:30am
Bid Date 9/12/25 3:00pm

Company & Contacts

Wagner General Contractors, Inc.
Michea Copus  
(501) 203-0704

Location

Little Rock, AR

Bid Information:

The below listed bids will be opened on the stated dates and times at the University of Arkansas for Medical Sciences, Planning Design and Construction Department, ISS Conference Room, Physical Plant Building, 1st Floor Room M/400 FINAL DATE TO SUBMIT: September 12, 2025, 3:00 pm Central Time.


Pre-Bid Information:

A mandatory pre-bid conference with prospective bidders will be held on September 2nd, 2025 at 9:30 am central standard time. Bidders will meet at the entrance to the Freeway Medical Tower on the South Side under the main entrance canopy. Prime Bidders failing to attend this meeting forfeit the right to submit a bid.


Hard copies of plans and specifications are available for purchase at contractor’s expense, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.