Eastbrook Trail Improvements
This project consists of repairing, patching and overlaying the trail as well as the installation of additional drainage pipes and structures. Also included with this project is an alternative option which includes substituting concrete and a wooden boardwalk for a portion of the asphalt trail.
Bid Documents
(click to expand/collapse)
(click to expand/collapse)
Hard copies of plans and specifications are available for purchase at contractor’s expense, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
| Name | Size | |||
| 001 COVER | 1.1 MB | |||
| 002 SHEET 1 OF 23 | 1.7 MB | |||
| 003 SHEET 2 OF 23 | 16.4 MB | |||
| 004 SHEET 3 OF 23 | 15.4 MB | |||
| 005 SHEET 4 OF 23 | 16.3 MB | |||
| 006 SHEET 5 OF 23 | 15.3 MB | |||
| 007 SHEET 6 OF 23 | 16.6 MB | |||
| 008 SHEET 7 OF 23 | 15.4 MB | |||
| 009 SHEET 8 OF 23 | 17.2 MB | |||
| 010 SHEET 9 OF 23 | 15.7 MB | |||
| 011 SHEET 10 OF 23 | 15.9 MB | |||
| 012 SHEET 11 OF 23 | 8.7 MB | |||
| 013 SHEET 12 OF 23 | 9.0 MB | |||
| 014 SHEET 13 OF 23 | 16.4 MB | |||
| 015 SHEET 14 OF 23 | 15.3 MB | |||
| 016 SHEET 15 OF 23 | 16.8 MB | |||
| 017 SHEET 16 OF 23 | 15.5 MB | |||
| 018 SHEET 17 OF 23 | 7.3 MB | |||
| 019 SHEET 18 OF 23 | 4.7 MB | |||
| 020 SHEET 19 OF 23 | 2.6 MB | |||
| 021 SHEET 20 OF 23 | 2.0 MB | |||
| 022 SHEET 21 OF 23 | 2.3 MB | |||
| 023 S101 | 1.2 MB | |||
| 024 S501 | 1.1 MB |

