Culvert Replacement (Hwy 72 & Sycamore)
This project consists of removing an existing pecan tree, approximately 24 LF of 48” RCP, two 24” CMP pipes at approximately 24 LF each and installing 40 LF of 54” RCP with flared end sections.
Bid Documents
(click to expand/collapse)

Hard copies of plans and specifications are available for purchase at contractor’s expense, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Name | Size | |||
001 COVER | 337.8 KB | |||
002 SHEET 2 OF 6 | 101.5 KB | |||
003 SHEET 3 OF 6 | 301.5 KB | |||
004 SHEET 4 OF 6 | 320.2 KB | |||
005 SHEET 5 OF 6 | 324.2 KB | |||
006 SHEET 6 OF 6 | 322.8 KB |