Central Station Drainage Pipe Repair
This Project entails the rehabilitation of 475 linear feet of vertical elliptical brick drainage pipe located near the Central Station rail station. Rehabilitation will consist of slip-lining the existing 40" (rise) by 33" (span) drainage pipe with glass-reinforced piping and associated material and labor.
Bid Documents
(click to expand/collapse)

Hard copies of plans and specifications are available for purchase at contractor’s expense, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Name | Size | |||
Specifications | 6.0 MB |