NE Gravel Parking Lot-Arena & Athletic Complex for Stuttgart Schools

Installing 6" Class 7 crushed stone base course over existing base. If Additive Alternate No. 1 is taken, Mirafi 140N geotextile fabric shall be installed beneath the crushed stone base. Installing rip rap at existing concrete headwall swale as shown on drawing.
Addenda (click to expand/collapse)
No files in this section