RMTC Airfield Repairs Phase 2
Preparation of the paving surface by means of washing, cleaning vegetations, and sealing cracks with hot-pour applications. B. Removal and storage of the existing helipad light fixtures. C. Milling asphalt as specified on the plans, and disposal of the existing paving materials to a location on the base property, to be determined. D. Construction of 2” ACHM overlay over the existing asphalt pavement E. Pavement marking work on the cured asphalt pavement surface. F. Installation of topsoil and sodding as specified on the plans.
Bid Documents
(click to expand/collapse)

Hard copies of plans and specifications are available for purchase at contractor’s expense, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Name | Size | |||
001-COVER | 274.1 KB | |||
002-T-1 | 788.1 KB | |||
003-T-2 | 427.7 KB | |||
004-C1-01 | 835.0 KB | |||
005-C1-01 | 285.8 KB | |||
006-C1-03 | 389.0 KB | |||
007-C2-01 | 831.3 KB | |||
008-C2-02 | 507.7 KB | |||
009-ED1-1 | 357.5 KB | |||
010-ED1-2 | 235.5 KB | |||
011-E1-1 | 219.5 KB | |||
012-E2-1 | 291.4 KB | |||
013-E2-2 | 356.1 KB | |||
014-E2-3 | 240.4 KB |