Wynne Wastewater treatment Maintenance Building Improvement

The work included in this Contract consists of the furnishing of all tools, labor, equipment, materials, and supplies necessary to fully construct and complete the project to the satisfaction of the Engineer and Owner, together with all incidental and ancillary work, as shown on the Drawings and as required.
Addenda (click to expand/collapse)
Hard copies of plans and specifications are available for purchase at contractor’s expense, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Download section as a Zip file free of charge
Name Size
Addendum 1 51.3 KB
Addendum 2 4.2 MB