Concord Batting Cages for Concord School District
A new pre-fabricated metal building with two (2) overhead coiling doors and three (3) walk doors. Building shall include interior batting cages installed on sports turf and tongue and groove plywood on interior walls.
Addenda
(click to expand/collapse)

Name | Size | ||
Addendum No.1 | 1.7 MB | ||
Addendum No. 2 | 1.3 MB | ||
Addendum No. 3 | 167.6 KB |