Asphalt Walking Track at Sycamore Elementary
Prepare the site according the specifications and drawings, install base material and asphalt surface. Supply all materials, tools, equipment and labor to perform the work in accordance to the specifications. Approximately 1,080 ft total length.
Addenda
(click to expand/collapse)
