BRTC-Pocahontas, Acoustical Wood Wall Panels

A. Complete demolition of designated portion of existing wall mounted fixtures and devices as noted. b. Prepare wall surface and install metal hat channel sub-structure for attaching acoustical insulation board and Acoustical Wood Wall Panels. c. Paint all walls and hollow metal door frames in Lobby area. d. Protect existing flooring, ceiling mounted fixtures and devices. Paint existing SAT. grid and tiles. Interior Painting: Interior gypsum wallboard, hollow metal frames, exposed structure, and attachments, new or repaired by this contract, shall be cleaned and painted. Contractors are responsible for verification of all existing site conditions, dimensions and quantities required to provide a complete project and specified warranties.

Status

Bidding Closed

Bid Date 8/19/25 2:00pm

Company & Contacts

Wagner General Contractors, Inc.
Michea Copus  
(501) 203-0704

Location

Pocahontas, AR

Bid Information:

SEALED Bids for the construction of BRTC Pocahontas - Acoustical Wood Wall Panels - RCDC Lobby will be received by Steiling Architecture on behalf of Black River Technical College, hereinafter termed Owner, until 2:00 p.m. local time, August 19, 2025, in the Business Technology Center Large Conference Room (entrance on east side of building) at Black River Technical Center, located at 1410 Hwy 305 East, Pocahontas, Arkansas, 72455 where the Bids will be opened and read aloud. Bidders are invited to attend. All Bids will be taken under advisement for review.


Hard copies of plans and specifications are available for purchase at contractor’s expense, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.