Sulphur Creek Trails - Phase I
The work shall consist of furnishing all labor, materials, equipment, and incidentals required in performing all operations in connection with installing a 10’ asphalt trail, in its entirety as shown on the Drawings and specified herein.
Bid Documents
(click to expand/collapse)
Hard copies of plans and specifications are available for purchase at contractor’s expense, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Name | Size | ||||
001 COVER | 606.2 KB | ||||
002 SHEET 1 | 11.7 MB | ||||
003 SHEET 2 | 8.7 MB | ||||
004 SHEET 3 | 9.0 MB | ||||
005 SHEET 4 | 9.9 MB | ||||
006 SHEET 5 | 9.2 MB | ||||
007 SHEET 6 | 10.2 MB | ||||
008 SHEET 7 | 8.9 MB | ||||
009 SHEET 8 | 15.0 MB | ||||
010 SHEET 9 | 11.1 MB | ||||
011 SHEET 10 | 4.4 MB | ||||
012 SHEET 11 | 615.9 KB | ||||
013 SHEET 12 | 2.7 MB | ||||
014 SHEET 13 | 2.0 MB |