Dominion World-New Church Facility

The work shall include, but is not limited to, removal of unacceptable fill material, placement of select fill, site drainage, site finish grading and landscaping, site fencing, site concrete walks and drives, asphalt paving, steel reinforced concrete slab foundation, pre-engineered steel structure, masonry, sheathing, light-gage metal framing, structural steel framing, drywall systems, acoustic ceiling systems, wood door assemblies, metal door assemblies, glass and aluminum storefront systems, pre-finished metal roof systems, pre-finished metal gutter systems, custom wood millwork and cabinetry, carpet, tile, appliances, and various painted surfaces and systems.
Addenda (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
Addendum No. 1 2.7 MB
Addendum No. 2 37.7 KB